Table of Contents

  1. 1.0 GENERAL Page 1
  2. 2.0 WATER USE CRITERIA Page 3
  3. 3.0 ANALYSIS OF EXISTING SYSTEM Page 6
    1. 3.1 Wholesale Supply Page 6
    2. 3.2 Distribution System Page 6
    3. 3.3 Storage Page 11
  4. 4.0 PROPOSED IMPROVEMENTS Page 13
    1. 4.1 0 to 5 Year Improvements Page 13
    2. 4.2 5 to 10 Year Improvements Page 13
    3. 4.3 10 to 15 Year Improvements Page 13
    4. 4.4 15 to 20 Year Improvements Page 14
    5. 4.5 Performance of Improved System Page 14
    6. 4.6 Lead Service Line ReplacementSummary Page 18
  5. 5.0 COST ESTIMATES Page 21
  6. 6.0 FINANCIAL IMPACT Page 26
  7. 7.0 SUMMARY Page 31

  8. LIST OF FIGURES
    1. Figure 1-1. Master Layout Page 2
    2. Figure 2-1. Annual Volumes Page 5
    3. Figure 3-1. Current System Hydraulic Modeling Results Page 9
    4. Figure 3-2. Pipe Material Page 10
    5. Figure 4-1. Proposed improvements Page 15
    6. Figure 4-2. Projected 10-Year hydraulic model results, with improvements Page 16
    7. Figure 4-3. Projected 20-Year hydraulic model results, with improvements Page 17

  9. LIST OF TABLES
    1. Table 2-1. Usage Summary Page 4
    2. Table 3-1. Pipeline friction loss targets Page 7
    3. Table 6-1. Improvement and budget schedule Page 28
    4. Table 6-2. Cash-Basis annual budget analysis Page 29
    5. Table 6-3. Benefit unit value Page 34